| Technical Area |
Project No. |
Catalog No. |
Title |
| Compressor and Pump Station |
PR-253-9622 |
L51783 |
100,000 Hour Design Life of Turbo Compressor Packages |
| Compressor and Pump Station |
PR-253-9622 |
L51783e |
100,000 Hour Design Life of Turbo Compressor Packages |
| Compressor and Pump Station |
NG-18 |
L51495e |
7th Symposium on Line Pipe Research, 1986 |
| Compressor and Pump Station |
PR-216-9117 |
L51710 |
Active Noise Silencing |
| Compressor and Pump Station |
PR-216-9117 |
L51710e |
Active Noise Silencing (eBook) |
| Compressor and Pump Station |
PR-004-0268 |
L52075e |
Analysis of Pipeline Data Standards |
| Compressor and Pump Station |
PR-15-613 |
L51565 |
Compilation of Emissions Data for Stationary Reciprocating Gas Engines and Gas Turbines in Use by the Natural Gas Pipeline Transmission Industry |
| Compressor and Pump Station |
PR-15-613 |
L51565e |
Compilation of Emissions Data for Stationary Reciprocating Gas Engines and Gas Turbines in Use by the Natural Gas Pipeline Transmission Industry |
| Compressor and Pump Station |
PR-15-9529 |
L51770 |
Compressor Station Maintenance Cost Analysis |
| Compressor and Pump Station |
PR-15-9529 |
L51770e |
Compressor Station Maintenance Cost Analysis |
| Compressor and Pump Station |
PR-215-9129 |
L51696 |
Compressor Station Technologies: Options for the Next 20 Years |
| Compressor and Pump Station |
PR-215-9129 |
L51696e |
Compressor Station Technologies: Options for the Next 20 Years |
| Compressor and Pump Station |
PR-246-9526 |
L51802 |
Cost Effective Leak Mitigation at Natural Gas Transmission Compressor Stations |
| Compressor and Pump Station |
PR-246-9526 |
L51802e |
Cost Effective Leak Mitigation at Natural Gas Transmission Compressor Stations (eBook) |
| Compressor and Pump Station |
Report 179 |
L51576 |
Crack Growth Behavior and Modeling |
| Compressor and Pump Station |
Report 179 |
L51576e |
Crack Growth Behavior and Modeling (eBook) |
| Compressor and Pump Station |
PR-240-9416 |
L51755 |
Development and Testing of an Advanced Technology Vibration Transmission |
| Compressor and Pump Station |
PR-240-9416 |
L51755e |
Development and Testing of an Advanced Technology Vibration Transmission |
| Compressor and Pump Station |
PR-179-9223 |
L51709 |
Development/Test Electronic Gas Admission for Large Bore Engines |
| Compressor and Pump Station |
PR-179-9223 |
L51709e |
Development/Test Electronic Gas Admission for Large Bore Engines (eBook) |
| Compressor and Pump Station |
PR-265-9722 |
L51796 |
Document CEM Experience in Natural Gas Transmission Industry |
| Compressor and Pump Station |
PR-265-9722 |
L51796e |
Document CEM Experience in Natural Gas Transmission Industry |
| Compressor and Pump Station |
Report 183 |
L51604 |
Ductile Fracture Properties of Selected Line-Pipe Steels |
| Compressor and Pump Station |
Report 183 |
L51604e |
Ductile Fracture Properties of Selected Line-Pipe Steels (eBook) |
| Compressor and Pump Station |
PR-162-157 |
L51461e |
Effects of Random Seas on Pipeline Stability, Volume 1: Wave/Soil Simulations and Simplified Design Methods |
| Compressor and Pump Station |
PR-3-152 |
L51468 |
Effects of Water Chemistry on Internal Corrosion Rates in Offshore Natural Gas Pipelines |
| Compressor and Pump Station |
PR-196-820 |
L51597 |
Feasibility Study of New Technology for Intake Air Filtration |
| Compressor and Pump Station |
PR-196-820 |
L51597e |
Feasibility Study of New Technology for Intake Air Filtration |
| Compressor and Pump Station |
PR-219-9225 |
L51724 |
Fiber Optic Pressure Sensor Development |
| Compressor and Pump Station |
PR-219-9225 |
L51724e |
Fiber Optic Pressure Sensor Development |
| Compressor and Pump Station |
PR-239-9438 |
L51754 |
Field Application of Electronic Gas Admission with Cylinder Pressure Feedback for Large Bore Engines |
| Compressor and Pump Station |
PR-239-9438 |
L51754e |
Field Application of Electronic Gas Admission with Cylinder Pressure Feedback for Large Bore Engines |
| Compressor and Pump Station |
PR-15-9417 |
L51729 |
Gas Scrubber Performance Evaluation - Measurement Methods |
| Compressor and Pump Station |
PR-15-9417 |
L51729e |
Gas Scrubber Performance Evaluation - Measurement Methods |
| Compressor and Pump Station |
PR-138-9724 |
L41023 |
Gas Transmission Industry Experience Of Turbine Parametric Emission Monitoring Systems (PEMS) |
| Compressor and Pump Station |
PR-138-9724 |
L41023e |
Gas Transmission Industry Experience Of Turbine Parametric Emission Monitoring Systems (PEMS) |
| Compressor and Pump Station |
PR-211-9213 |
L51723 |
Guidelines for Sound Power Level Measurements Compressor Equipment |
| Compressor and Pump Station |
PR-211-9213 |
L51723e |
Guidelines for Sound Power Level Measurements Compressor Equipment |
| Compressor and Pump Station |
PR-196-016 |
L51655 |
Improved Intake Air Filtration Systems |
| Compressor and Pump Station |
PR-196-016 |
L51655e |
Improved Intake Air Filtration Systems (eBook) |
| Compressor and Pump Station |
PR-15-9527 |
L51766 |
Instantaneous Rotational Velocity Development |
| Compressor and Pump Station |
PR-15-9527 |
L51766e |
Instantaneous Rotational Velocity Development |
| Compressor and Pump Station |
PR-15-9528 |
L51797 |
Life Management of the RB211-24C Gas Turbine |
| Compressor and Pump Station |
PR-15-9528 |
L51797e |
Life Management of the RB211-24C Gas Turbine |
| Compressor and Pump Station |
PR-70-54/TR-72-50 |
L00972 |
Magnetic Flux Leakage of Small Defects in Line Pipe |
| Compressor and Pump Station |
PR-70-54/TR-72-50 |
L00972e |
Magnetic Flux Leakage of Small Defects in Line Pipe |
| Compressor and Pump Station |
NX-19 |
L00340 |
Manual for Determination of Supercompressibility Factors |
| Compressor and Pump Station |
NX-19 |
L00340e |
Manual for Determination of Supercompressibility Factors (eBook) |
| Compressor and Pump Station |
Report 177 |
L51575 |
Mechanics-Based Analysis of Stress-Corrosion Cracking of Line-Pipe in a Carbonate-Bicarbonate Environment |
| Compressor and Pump Station |
Report 177 |
L51575e |
Mechanics-Based Analysis of Stress-Corrosion Cracking of Line-Pipe in a Carbonate-Bicarbonate Environment (eBook) |
| Compressor and Pump Station |
PR-236-9418 |
L51753 |
Natural Draft Aerial Coolers |
| Compressor and Pump Station |
PR-236-9418 |
L51753e |
Natural Draft Aerial Coolers |
| Compressor and Pump Station |
PO-50 |
L00400e |
New Concepts in Underground Storage of Natural Gas |
| Compressor and Pump Station |
PR-15-65 |
L00377e |
Noise Control Handbook (1977) Volumes 1 & 2 |
| Compressor and Pump Station |
PR-15-65 |
L00377 |
Noise Control Handbook (1977) Volumes 1 & 2 |
| Compressor and Pump Station |
PR-258-9619 |
L51916 |
Pressure Based Parametric Emission Monitoring Systems (PEMS) |
| Compressor and Pump Station |
PR-258-9619 |
L51916e |
Pressure Based Parametric Emission Monitoring Systems (PEMS) (eBook) |
| Compressor and Pump Station |
PR-184-608 |
L51557e |
Pressure Losses in Compressor Station Yard Pipework - Phase II |
| Compressor and Pump Station |
PR-184-608 |
L51557 |
Pressure Losses in Compressor Station Yard Pipework - Phase II |
| Compressor and Pump Station |
PR-266-9721 |
L51813 |
Re-Aeroing an Elliott L-40 Turbocharger |
| Compressor and Pump Station |
PR-266-9721 |
L51813e |
Re-Aeroing an Elliott L-40 Turbocharger (eBook) |
| Compressor and Pump Station |
PR-179-9131 |
L51756 |
State of the Art Intelligent Control for Large Engines |
| Compressor and Pump Station |
PR-179-9131 |
L51756e |
State of the Art Intelligent Control for Large Engines |
| Compressor and Pump Station |
NB 13 |
L00007 |
Steady Flow in Gas Pipelines (IGT#10) |
| Compressor and Pump Station |
NB 13 |
L00007e |
Steady Flow in Gas Pipelines (IGT#10) (eBook) |
| Compressor and Pump Station |
PR-133-103 |
L51424 |
Survey and Analysis of Flue Gas Treatment Methods. Volume 2: Selective Catalytic Reduction of Nitrogen Oxides by Manually Controlled Ammonia Injection |
| Compressor and Pump Station |
PR-133-103 |
L51424e |
Survey and Analysis of Flue Gas Treatment Methods. Volume 2: Selective Catalytic Reduction of Nitrogen Oxides by Manually Controlled Ammonia Injection |
| Compressor and Pump Station |
PR-15-9816 |
L51814 |
Survey Of Dry Low NOx Combustor Experience |
| Compressor and Pump Station |
PR-15-9816 |
L51814e |
Survey Of Dry Low NOx Combustor Experience (eBook) |
| Compressor and Pump Station |
NC-8 |
L00250e |
Using Foaming Agents to Remove Liquids from Gas Wells |
| Compressor and Pump Station |
NC-8 |
L00250 |
Using Foaming Agents to Remove Liquids from Gas Wells |
| Compressor and Pump Station |
NB-16 |
L00200 |
Wear in Pipeline Engines and Compressors - Methods of Measurement |
| Compressor and Pump Station |
NB-16 |
L00200e |
Wear in Pipeline Engines and Compressors - Methods of Measurement |
| Corrosion and Inspection |
Report 127 |
L51425 |
A Study of Interrupted Cathodic Protection as it Relates to Stress-Corrosion Cracking and Corrosion of Buried Pipelines |
| Corrosion and Inspection |
Report 127 |
L51425e |
A Study of Interrupted Cathodic Protection as it Relates to Stress-Corrosion Cracking and Corrosion of Buried Pipelines |
| Corrosion and Inspection |
PR-262-9913 |
L51908 |
AC Grounding Effects on Cathodic Protection Performance of Pipeline Stations |
| Corrosion and Inspection |
PR-262-9913 |
L51908e |
AC Grounding Effects on Cathodic Protection Performance of Pipeline Stations (eBook) |
| Corrosion and Inspection |
Various |
L51820e |
AC Mitigation Collection |
| Corrosion and Inspection |
Report 110 |
L11777 |
Addition of Inhibitors to the Soil above Pipelines to Minimize Stress Corrosion Cracking |
| Corrosion and Inspection |
Report 110 |
L11777e |
Addition of Inhibitors to the Soil above Pipelines to Minimize Stress Corrosion Cracking |
| Corrosion and Inspection |
PR-3-41 |
L30500 |
Analysis of the Effects of High-Voltage Direct-Current Transmission Systems on Buried Pipelines |
| Corrosion and Inspection |
PR-3-41 |
L30500e |
Analysis of the Effects of High-Voltage Direct-Current Transmission Systems on Buried Pipelines |
| Corrosion and Inspection |
PR-186-03132 |
L52209 |
Application of Repair Coatings to Wet Surfaces |
| Corrosion and Inspection |
PR-186-03132 |
L52209e |
Application of Repair Coatings to Wet Surfaces |
| Corrosion and Inspection |
PR-151-106 |
L51419 |
Assessing Cathodic Protection Levels of Well Casings |
| Corrosion and Inspection |
PR-186-917 |
L51666 |
Assessment of the Effects of Surface Preparations and Coatings on the Susceptibility of Line Pipe to Stress Corrosion Cracking |
| Corrosion and Inspection |
PR-186-917 |
L51666e |
Assessment of the Effects of Surface Preparations and Coatings on the Susceptibility of Line Pipe to Stress Corrosion Cracking (eBook) |
| Corrosion and Inspection |
Report 144 |
L51474 |
Brittle Fracture Initiation of Heavy-Wall Components |
| Corrosion and Inspection |
Report 144 |
L51474e |
Brittle Fracture Initiation of Heavy-Wall Components |
| Corrosion and Inspection |
PR-238-9423 |
L51809 |
Buckling and Collapse of UOE Manufactured Steel Pipes |
| Corrosion and Inspection |
PR-238-9423 |
L51809e |
Buckling and Collapse of UOE Manufactured Steel Pipes |
| Corrosion and Inspection |
PR-75-9609 |
L51902 |
Cathodic Disbondment of Pipeline Coatings under Realistic Conditions |
| Corrosion and Inspection |
PR-75-9609 |
L51902e |
Cathodic Disbondment of Pipeline Coatings under Realistic Conditions (eBook) |
| Corrosion and Inspection |
PR-186-9807 |
L51897 |
Cathodic Protection Conditions Conducive to SCC |
| Corrosion and Inspection |
PR-186-9807 |
L51897e |
Cathodic Protection Conditions Conductive to SCC (eBook) |
| Corrosion and Inspection |
PR-262-9809 |
L51800 |
Cathodic Protection Considerations for Pipelines w/ AC Mitigation Facilities |
| Corrosion and Inspection |
PR-262-9809 |
L51800e |
Cathodic Protection Considerations for Pipelines w/AC Mitigation Facilities (eBook) |
| Corrosion and Inspection |
PR-151-123 |
L51432 |
Cathodic Protection for Offshore Pipelines |
| Corrosion and Inspection |
PR-151-123 |
L51432e |
Cathodic Protection for Offshore Pipelines |
| Corrosion and Inspection |
PR-186-006 |
L51667 |
Causes and Effects of the Spiking Phenomenom |
| Corrosion and Inspection |
PR-186-006 |
L51667e |
Causes and Effects of the Spiking Phenomenom |
| Corrosion and Inspection |
Report 212 |
L51807 |
Characterization of Axial Flaws in Pipelines, with a Focus on Stress Corrosion Cracking |
| Corrosion and Inspection |
Report 212 |
L51807e |
Characterization of Axial Flaws in Pipelines, with a Focus on Stress Corrosion Cracking (eBook) |
| Corrosion and Inspection |
PR-75-9310 |
L51736 |
Chemical and Electrochemical Conditions on Steel at Disbonded Coatings |
| Corrosion and Inspection |
PR-75-9310 |
L51736e |
Chemical and Electrochemical Conditions on Steel at Disbonded Coatings (eBook) |
| Corrosion and Inspection |
PR-15-9313 |
L51784 |
CO2/HS Corrosion Under Wet Low-Flow Gas Pipeline Conditions in Presence of Bicarbonate, Chloride, & Oxygen |
| Corrosion and Inspection |
PR-15-9313 |
L51784e |
CO2/HS Corrosion Under Wet Low-Flow Gas Pipeline Conditions in Presence of Bicarbonate, Chloride, & Oxygen (eBook) |
| Corrosion and Inspection |
PR-186-0109 |
L51961 |
Coating Compatibility at Thermite Welds and Keyhole Excavations |
| Corrosion and Inspection |
PR-186-0109 |
L51961e |
Coating Compatibility at Thermite Welds and Keyhole Excavations |
| Corrosion and Inspection |
PR-230-9914 |
L51911 |
Conditions that Lead to the Generation of SCC Environments - A Review |
| Corrosion and Inspection |
PR-230-9914 |
L51911e |
Conditions that Lead to the Generation of SCC Environments - A Review (eBook) |
| Corrosion and Inspection |
PR-3-629 |
L51540 |
Corrosion Criteria for J-Tube Risers |
| Corrosion and Inspection |
PR-3-629 |
L51540e |
Corrosion Criteria for J-Tube Risers |
| Corrosion and Inspection |
PR-278-9915 |
L51912 |
Corrosion/CP Monitoring of Locations Remote from a Test Station |
| Corrosion and Inspection |
PR-278-9915 |
L51912e |
Corrosion/CP Monitoring of Locations Remote from a Test Station (eBook) |
| Corrosion and Inspection |
PR-3-165 |
L51544 |
Criteria to Stop Active Pit Growth |
| Corrosion and Inspection |
PR-3-165 |
L51544e |
Criteria to Stop Active Pit Growth (eBook Version) |
| Corrosion and Inspection |
PR-75-9714 |
L51903 |
Damage to FBE and Liquid Epoxy Coating from Hydrogen Outgassing from Welds |
| Corrosion and Inspection |
PR-75-9714 |
L51903e |
Damage to FBE and Liquid Epoxy Coating from Hydrogen Outgassing from Welds |
| Corrosion and Inspection |
PR-220-9815 |
L51925 |
Detection of Anomalies in Coated Pipelines Using Long Range Ultrasonics |
| Corrosion and Inspection |
PR-220-9815 |
L51925e |
Detection of Anomalies in Coated Pipelines Using Long Range Ultrasonics (eBook) |
| Corrosion and Inspection |
PR-198-903 |
L51637 |
Development of an Ultrasonic Stress Corrosion Cracking Detection Vehicle |
| Corrosion and Inspection |
PR-198-903 |
L51637e |
Development of an Ultrasonic Stress Corrosion Cracking Detection Vehicle |
| Corrosion and Inspection |
PR-186-9220 |
L51888 |
Development of Coupons for Monitoring Cathodic Protection Systems |
| Corrosion and Inspection |
PR-186-9220 |
L51888e |
Development of Coupons for Monitoring Cathodic Protection Systems (eBook) |
| Corrosion and Inspection |
PR-15-411 |
L51506e |
Development of Improved Methods to Inspect Storage Well Downhole |
| Corrosion and Inspection |
PR-15-411 |
L51506 |
Development of Improved Methods to Inspect Storage Well Downhole |
| Corrosion and Inspection |
PR-186-0025 |
L51886 |
Development of Quality and Performance Specifications For Magnesium Anodes |
| Corrosion and Inspection |
PR-186-0025 |
L51886e |
Development of Quality and Performance Specifications For Magnesium Anodes |
| Corrosion and Inspection |
PR-250-9719 |
L51947 |
Development of Real-Time NDT Technology for Discriminating and Assessing the Extent of Internal Pipeline Corrosion |
| Corrosion and Inspection |
PR-250-9719 |
L51947e |
Development of Real-Time NDT Technology for Discriminating and Assessing the Extent of Internal Pipeline Corrosion |
| Corrosion and Inspection |
PR-3-81 |
L11577 |
Development of Techniques for Improving Downhole Inspection of Steel Pipe Casing |
| Corrosion and Inspection |
PR-3-81 |
L11577e |
Development of Techniques for Improving Downhole Inspection of Steel Pipe Casing |
| Corrosion and Inspection |
PR-101-9512 |
L51900 |
Development of User Friendly Models for Design of CP Systems for Buried Pipelines (CP3D) |
| Corrosion and Inspection |
PR-101-9512 |
L51900e |
Development of User Friendly Models for Design of CP Systems for Buried Pipelines (CP3D) |
| Corrosion and Inspection |
Report 148 |
L51491 |
Effect of Temperature on Stress-Corroiosn Cracking of Pre-Cracked Line-Pipe Steel |
| Corrosion and Inspection |
Report 148 |
L51491e |
Effect of Temperature on Stress-Corroiosn Cracking of Pre-Cracked Line-Pipe Steel |
| Corrosion and Inspection |
PR-3-505 |
L51585 |
Effects of Seasonal Variations on Requirements to Prevent Corrosion in Soils |
| Corrosion and Inspection |
PR-3-505 |
L51585e |
Effects of Seasonal Variations on Requirements to Prevent Corrosion in Soils |
| Corrosion and Inspection |
PR-232-9704 |
L51806 |
Effects of Hydrogen on Low-pH Stress Corrosion Crack Growth |
| Corrosion and Inspection |
PR-232-9704 |
L51806e |
Effects of Hydrogen on Low-pH Stress Corrosion Crack Growth (eBook) |
| Corrosion and Inspection |
Report 137 |
L51444 |
Effects of Hydrostatic Retesting on Stress Corrosion Cracking |
| Corrosion and Inspection |
Report 137 |
L51444e |
Effects of Hydrostatic Retesting on Stress Corrosion Cracking |
| Corrosion and Inspection |
Report 186 |
L51619 |
Effects of Loading on the Growth Rates of Deep Stress-Corrosion Cracks |
| Corrosion and Inspection |
Report 186 |
L51619e |
Effects of Loading on the Growth Rates of Deep Stress-Corrosion Cracks (eBook) |
| Corrosion and Inspection |
PR-247-9511 |
L51798 |
Effects of Phosphoric Acid Treatment on Performance of FBE Coating |
| Corrosion and Inspection |
PR-247-9511 |
L51798e |
Effects of Phosphoric Acid Treatment on Performance of FBE Coating (eBook) |
| Corrosion and Inspection |
PR-15-9712 |
L51793 |
Effects of Water Chemistry on Internal Corrosion of Steel Pipelines |
| Corrosion and Inspection |
PR-15-9712 |
L51793e |
Effects of Water Chemistry on Internal Corrosion of Steel Pipelines (eBook) |
| Corrosion and Inspection |
PR-3-152 |
L51468e |
Effects of Water Chemistry on Internal Corrosion Rates in Offshore Natural Gas Pipelines |
| Corrosion and Inspection |
PR-003-9715 |
L51946 |
Enhanced Implementation of MFL Using EMAT Sensors to Detect External Coating Disbondment |
| Corrosion and Inspection |
PR-003-9715 |
L51946e |
Enhanced Implementation of MFL Using EMAT Sensors to Detect External Coating Disbondment (eBook) |
| Corrosion and Inspection |
PR-262-0114 |
L52127 |
Evaluation & Comparison of Soil Resistivity Measurement Techniques |
| Corrosion and Inspection |
PR-262-0114 |
L52127e |
Evaluation & Comparison of Soil Resistivity Measurement Techniques |
| Corrosion and Inspection |
PR-15-423 |
L51492 |
Examination of the Kaiser Effect in Pipeline Steels |
| Corrosion and Inspection |
PR-15-423 |
L51492e |
Examination of the Kaiser Effect in Pipeline Steels (eBook) |
| Corrosion and Inspection |
PR-186-9610 |
L51792 |
External Corrosion Control Monitoring Practices (Vol. I & II) |
| Corrosion and Inspection |
PR-186-9610 |
L51792e |
External Corrosion Control Monitoring Practices (Vol. I & II) (eBook) |
| Corrosion and Inspection |
PR-003-9407 |
L51803 |
Failure Criterion for Stress-Corrosion Cracking in Pipelines |
| Corrosion and Inspection |
PR-003-9407 |
L51803e |
Failure Criterion for Stress-Corrosion Cracking in Pipelines (eBook) |
| Corrosion and Inspection |
PR-3-703 |
L51587 |
Field Techniques to Determine Electrical Shorts between Carriers |
| Corrosion and Inspection |
PR-3-703 |
L51587e |
Field Techniques to Determine Electrical Shorts between Carriers (eBook) |
| Corrosion and Inspection |
PR-208-163 |
L51715 |
Field Testing the Criteria for CP of Buried Pipelines |
| Corrosion and Inspection |
PR-208-163 |
L51715e |
Field Testing the Criteria for CP of Buried Pipelines |
| Corrosion and Inspection |
PR-015-03125 |
L52131e |
Gap Analysis of Location Techniques for CP Shielding |
| Corrosion and Inspection |
PR-015-03125 |
L52131 |
Gap Analysis of Location Techniques for CP Shielding |
| Corrosion and Inspection |
PR-186-9918 |
L52100e |
Hot Spot Protection for Impressed Current Systems |
| Corrosion and Inspection |
PR-186-9918 |
L52100 |
Hot Spot Protection for Impressed Current Systems |
| Corrosion and Inspection |
PR-186-9611 |
L51801 |
Impact of Short-Term Depolarization of Pipelines |
| Corrosion and Inspection |
PR-186-9611 |
L51801e |
Impact of Short-Term Depolarization of Pipelines (eBook) |
| Corrosion and Inspection |
PR-273-9803 |
L51878 |
Improved Methods for Assessment of Remaining Strength of Corroded Pipelines |
| Corrosion and Inspection |
PR-273-9803 |
L51878e |
Improved Methods for Assessment of Remaining Strength of Corroded Pipelines (eBook) |
| Corrosion and Inspection |
PR-186-807 |
L51640 |
Improved Pipe-to-Soil Potential Survey Methods |
| Corrosion and Inspection |
PR-186-807 |
L51640e |
Improved Pipe-to-Soil Potential Survey Methods |
| Corrosion and Inspection |
PR-155-909 |
L51630 |
In-Line Detection and Sizing of Stress Corrosion Cracks Using EMAT Ultrasonics |
| Corrosion and Inspection |
PR-155-909 |
L51630e |
In-Line Detection and Sizing of Stress Corrosion Cracks Using EMAT Ultrasonics (eBook) |
| Corrosion and Inspection |
PR-262-9738 |
L51799 |
In-Situ Evaluation of Directional Drill/Bore Coating Quality |
| Corrosion and Inspection |
PR-262-9738 |
L51799e |
In-Situ Evaluation of Directional Drill/Bore Coating Quality (eBook) |
| Corrosion and Inspection |
PR-15-9916 |
L51914 |
Interdependent Effects of Bacteria, Gas Composition, and Water Chemistry on Internal Corrosion of Steel Pipelines |
| Corrosion and Inspection |
PR-15-9916 |
L51914e |
Interdependent Effects of Bacteria, Gas Composition, and Water Chemistry on Internal Corrosion of Steel Pipelines (eBook) |
| Corrosion and Inspection |
PR-15-9808 |
L51907 |
Internal Corrosion Risk Assessment & Management of Steel Pipelines |
| Corrosion and Inspection |
PR-15-9808 |
L51907e |
Internal Corrosion Risk Assessment & Management of Steel Pipelines (eBook) |
| Corrosion and Inspection |
PR-15-625 |
L51504 |
Investigation of Real-Time Radiographic Methods for Use in Pipeline Weld Inspection |
| Corrosion and Inspection |
PR-15-625 |
L51504e |
Investigation of Real-Time Radiographic Methods for Use in Pipeline Weld Inspection (eBook) |
| Corrosion and Inspection |
PR-3-67 |
L00037e |
Line Pipe Coating Analysis Volume 2: Topical Report on Adhesion |
| Corrosion and Inspection |
PR-3-67 |
L00037 |
Line Pipe Coating Analysis Volume 2: Topical Report on Adhesion |
| Corrosion and Inspection |
PR-3-67 |
L00036 |
Line Pipe Coating Analysis, Volume 1 Laboratory Studies and Results |
| Corrosion and Inspection |
PR-3-67 |
L00036e |
Line Pipe Coating Analysis, Volume 1 Laboratory Studies and Results |
| Corrosion and Inspection |
PR-230-9413 |
L51791 |
Low pH SCC: Environmental Effects on Crack Propagation |
| Corrosion and Inspection |
PR-230-9413 |
L51791e |
Low pH SCC: Environmental Effects on Crack Propagation (eBook) |
| Corrosion and Inspection |
PR-151-816 |
L51608 |
Method for Assessing Electrical Resistance of Pipeline Casing |
| Corrosion and Inspection |
PR-151-816 |
L51608e |
Method for Assessing Electrical Resistance of Pipeline Casing |
| Corrosion and Inspection |
PR-3-919 |
L51631 |
Methods Prioritizing Pipe Maintenance and Rehabilitation |
| Corrosion and Inspection |
PR-3-919 |
L51631e |
Methods Prioritizing Pipe Maintenance and Rehabilitation (eBook) |
| Corrosion and Inspection |
PR-186-9203 |
L51693 |
Most Accurate Method for Measuring an Off-Potential |
| Corrosion and Inspection |
PR-186-9203 |
L51693e |
Most Accurate Method for Measuring an Off-Potential |
| Corrosion and Inspection |
PR-186-9105 |
L51692 |
Multiple Pipelines in Right of Way: Improved Pipe-to-Soil Potential Survey Methods |